• ODT Gun Show this Saturday! - Click here for info and tickets!

Recent content by WMSproject

  1. Item Gone: FS/FT 2004 Harley Davidson XL 883 Screaming Eagle

    The bike is as it came from the Dealer (Dealer Installed Package), minus age and condition. It had Ignition, Add-ons, Jets, Air Cleaner, Pipes, etc on the showroom. It is sold, BTW.
  2. Item Gone: FS/FT Chopper Frame Jig

    Item Name: FS/FT Chopper Frame Jig Location: Rocky Face, GA Zip Code: 30740 Item is for: Sale or Trade Sale Price: 100 Trade Value or Items Looking For: 100 Caliber: Awesome... Willing to Ship: No Bill of Sale Required?: No Item Description: I have a hardtail chopper frame jig for sale. I...
  3. Whatcha toting TODAY? as in... right this instant....

    Ruger LC9s and extra mag, Victorinox Swiss Army Knife, Gerber EVO, SOG Seal Pup.
  4. Item Gone: FS/FT 2004 Harley Davidson XL 883 Screaming Eagle

    Item Name: FS/FT 2004 Harley Davidson XL 883 Screaming Eagle Location: Rocky Face Zip Code: 30740 Item is for: Sale or Trade Sale Price: $2900 (Taking Offers) Trade Value or Items Looking For: Guns or Large Travel Trailer Willing to Ship: No Bill of Sale Required?: Yes Billing Information...
  5. Item Gone: FS/FT RENKEN 21' boat and trailer

    Item Name: FS/FT RENKEN 21' boat and trailer Location: Rocky Face Zip Code: 30740 Item is for: Sale or Trade Sale Price: $300 OBO Trade Value or Items Looking For: $300 Willing to Ship: No Bill of Sale Required?: No Item Description: I have a 21' RENKEN Classic 2000 inboard cabin cruiser...
  6. THIS IS SOME BULL ****

    Guilty or not guilty doesn't mean anything if the laws are unjust.
  7. THIS IS SOME BULL ****

    And Zimmerman walks free... Honorable serviceman is in jail for 25 years and that scumbag (regardless of guilt or innocence, he is a scumbag) walks free.
  8. THIS IS SOME BULL ****

    http://famm.org/michael-giles/ This gentleman defended himself with a pistol and is sentenced to 25 years. The facts are not in dispute but Florida law mandates it.
  9. NEED AR PISTOL LOWER

    Apparently, I'm wrong... TECHNICALLY... https://www.atf.gov/files/regulations-rulings/rulings/atf-rulings/atf-ruling-2011-4.pdf The ATF says that you CAN convert a pistol into a rifle and then back again... as long as you do things in a certain order and have certain parts nearby, apparently...
  10. Shopping for a beater/daily driver. Which is best for guns?

    http://jalopnik.com/guy-in-ohio-arrested-for-having-empty-compartment-in-hi-1485898693
  11. Item Gone: FS/FT Lee Challenger Anniversary Set and Extras

    Sold pending meeting
Back
Top Bottom