Might as well weigh in here. If you are thinking about generators, (especially Generac) they have about a 6 to 8 month lead time.

I have a 20 kW unit on order with expected install in late September. Probably will push past that date cause everything else has.
 
Bought a few years back.
22kw and 500 gallon propane tank.
 

Attachments

  • 69489B88-DD9E-493A-816B-1D322A405CD1.jpeg
    69489B88-DD9E-493A-816B-1D322A405CD1.jpeg
    99.1 KB · Views: 33
Might as well weigh in here. If you are thinking about generators, (especially Generac) they have about a 6 to 8 month lead time.

I have a 20 kW unit on order with expected install in late September. Probably will push past that date cause everything else has.
Guess
I better see how much wattage I’ll need at the new place and get in line.
Was hoping to get hooked up before height of hurricane season.
Guess we can limp along on the old gasoline powered one until then.
 